Answer: (1) The test run of rotating machinery should be carried out after the installation or maintenance work has been completed, the work ticket has been terminated, or there is a test run application form. During the test run, relevant personnel should be present and the operator is responsible for inspection.
(2) First, a no-load test run should be carried out to ensure the safety of the equipment.
(3) When the air compressor main engine is started for the first time, some lubricating oil should be added to the main engine separately. Before installing the oil filter, sufficient lubricating oil should also be added to meet the lubrication needs at the initial start-up.
(4) Carefully carry out the inspection before the first start-up.